Flow of run-off water from the Fazoli site.into the Allen
Creek. The parcel may be a part of the
headwaters system of the creek.
The site does not have the same requirements concerning drainage
as would a virgin site.
What would be the minimum and maximum requirements would be if this were
a new site.
|
Does the nature of the business
truly create the need for such a large number of parking spaces.
Consider the number of parking
spots to patrons ratio (sit down not drive-through)
rush hour: timing and number
of patrons
demographics
seasonality
|
What are their corporate recycling
polices and can they fit with local needs?
Do they have the parking lots clean as a normal practice?
Do they use local businesses as suppliers?
What about smell pollution policies (county health department--Dick
Fleece)? |